Posts from Mafia 41. Rainie-1.
Auto-translated
Was the previous time during the No Development phase?

Барон "Vampires"
Отдай свои прошлые сны,
В сомненьях себя обрети,
В бешеном танце душа кружится!
Не думай, что будет потом,
Здесь и сейчас мы живем,
Стань хоть на миг сам собой, слышишь!
Didn't Zubr even realize I was investigating for the second night? Lol
Did Zubr not even realize that I was working on it for the second night? Lol
Zubr should be punished, yes.

Барон "Vampires"
Отдай свои прошлые сны,
В сомненьях себя обрети,
В бешеном танце душа кружится!
Не думай, что будет потом,
Здесь и сейчас мы живем,
Стань хоть на миг сам собой, слышишь!
Maybe the Governor is a noob and a lol. X)
Execute Arandor - Mortulus
It's already clear that Ment is not Kana, because he was blocked, and she went.
🏹🎪+⛓️♿=💕
By the way, why was Hostor monitored twice?
Was the previous time during the ND zero phase?
Sincerely, Morning.
Two statuses. Apparently, Jane wanted to find out about the second one.

Барон "Vampires"
Отдай свои прошлые сны,
В сомненьях себя обрети,
В бешеном танце душа кружится!
Не думай, что будет потом,
Здесь и сейчас мы живем,
Стань хоть на миг сам собой, слышишь!
Okay, so who should be executed then? Amko or Morny? I doubt they'll correctly decipher the clue.
And besides, Zero hasn't provided much help so far.
Second flight
Launched on October 23, 2007, at 15:38:18.996 UTC as Flight Engineer 5 (MS-5) on the crew of the Space Shuttle Discovery STS-120. The shuttle docked with the ISS on October 25 at 12:40 UTC (16:40 Moscow time). Upon arrival at the station, he replaced astronaut Clayton Anderson in the main crew of the 16th ISS expedition.
During the flight, he performed five spacewalks:
October 28, 2007 - lasting 6 hours and 33 minutes. During the spacewalk, the astronauts installed handrails and electrical connectors on the Harmony module, continued work on the Z1 and P6 segments, and tested the mechanism that rotates the solar panels.
November 20, 2007 - lasting 7 hours and 16 minutes. During the spacewalk, the astronauts worked on one of the circuits of the Harmony module's thermal control system and reconfigured the power system.
November 24, 2007 - lasting 7 hours and 4 minutes. During the spacewalk, the astronauts laid electrical cables and cooling system pipes between the Harmony module and the Destiny laboratory.
December 18, 2007 - lasting 6 hours and 56 minutes. During the spacewalk, the astronauts inspected the automatic solar panel rotation system installed on the S4 truss segment. In addition, they removed one of the parts of the system and moved it to the station for further inspection.
January 30, 2008 - lasting 7 hours and 10 minutes. During the spacewalk, the astronauts replaced the bearing mechanism module of the rotating joint with an electric drive (BMRRM) in the battery orientation device on the S4 truss.
Registration: 07/16.2007
Everyone agrees that Zero killed me using a Demon's Nuke, right?